Error message
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityAPIController->load() (line 219 of /srv/www/drupal7/sites/all/modules/entity/includes/entity.controller.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in DrupalDefaultEntityController->cacheGet() (line 388 of /srv/www/drupal7/includes/entity.inc).

The Lennox, Parramatta construction update

The Lennox, Parramatta construction update
The latest construction update by parraman from skyscrapercity.com

Designed by architecture firm Marchese Partners and developed by EQ Projects, the construction of The Lennox remains a steady pace with the core box reaching 12 floors and floor plates being successfully filled to the height equivalent of 8 levels.

Construction of the tower is set to be completed in mid to late 2020.

Urban Editorial

Urban Editorial

From the Urban.com.au editorial news team.