Error message
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: DOMDocument::loadHTML(): Tag figure invalid in Entity, line: 4 in po_news_analytics_fix() (line 1972 of /srv/www/drupal7/sites/all/modules/_custom/urban_utils/urban_utils.module).
  • Warning: DOMDocument::loadHTML(): error parsing attribute name in Entity, line: 4 in po_news_analytics_fix() (line 1972 of /srv/www/drupal7/sites/all/modules/_custom/urban_utils/urban_utils.module).
  • Warning: DOMDocument::loadHTML(): Tag figcaption invalid in Entity, line: 6 in po_news_analytics_fix() (line 1972 of /srv/www/drupal7/sites/all/modules/_custom/urban_utils/urban_utils.module).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityCacheControllerHelper::entityCacheLoad() (line 73 of /srv/www/drupal7/sites/all/modules/entitycache/includes/entitycache.entitycachecontrollerhelper.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in EntityAPIController->load() (line 219 of /srv/www/drupal7/sites/all/modules/entity/includes/entity.controller.inc).
  • Warning: array_flip(): Can only flip STRING and INTEGER values! in DrupalDefaultEntityController->cacheGet() (line 388 of /srv/www/drupal7/includes/entity.inc).

East Brunswick Village construction update

East Brunswick Village construction update
East Brunswick Village construction update

Stage One which includes three buildings of the East Brunswick Village are almost topped out with approximately one and two floors remaining to be poured on the side. Foundations and piling are set to begin for Stage Two across the upcoming laneway created by the project. So far, 15,000 truck and trailer loads of materials have been recycled from the site.

Images via drone footage from Builder’s Hacer Group Instagram.
Images via drone footage from Builder’s Hacer Group Instagram.

Urban Editorial

Urban Editorial

From the Urban.com.au editorial news team.